Interior Lighting
 

Interior Lighting:
THE “FEEL-GOOD” FACTOR

The trend toward LEDs as light sources in vehicle interiors continues unabated. HELLA has excelled at installing LEDs as interior lights since 2001. Our portfolio of interior lighting products includes not only conventional bulb lights, but also lights with sophisticated comfort electronics. Classic small lights, interior lights and interior reading lamps, roof modules, ambient interior lighting systems that are used to create color atmospheres and moods, and optimized light guide technology complete our portfolio. This range of products lets HELLA offer vehicle manufacturers a wealth of possibilities for using interior lights to create vehicle-specific interior designs.

02/21/2012

Milestones

 
 
 
 
 
 
 
LINKS

Click here to learn more about our comprehensive lighting expertise.

Lighting expertise
 
10/28/2016
Contact
Hella Innenleuchten-Systeme GmbH


Maienbühlstraße 7
79677 Wembach
Tel: +49 76 73 8207-0

 
02/21/2012
Product Gallery